ENR Critical Path Podcast

ENR Critical Path Podcast

Hosted by Aileen Cho and Jeff Yoders and Bryan Gottlieb · www.enr.com

4.1from 9 ratings

Books guestsus

Unclaimed — is this your show?

51Podcast AuthorityScore out of 100 · How it is scored
146
Episodes
29
Transcribed
9
Ratings
Daily
Cadence
2019
First episode

About ENR Critical Path Podcast

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

Publisher
www.enr.com
Category
business
Language
en
Explicit
No
First episode
18 Dec 2019
Latest episode
1 Oct 2026

Latest episodes

29 of 146 episodes have a transcript.

  1. 1 Oct 2026TRANSCRIPT

    Breaking Down the Handoff Wall: Connecting Design, Construction and Delivery

  2. 30 Sept 2026TRANSCRIPT

    Stephen Cavanaugh on Mass Timber’s Rising Popularity

  3. 23 Sept 2026TRANSCRIPT

    Skanska Civil’s Geoffrey Bender Can Dig It

Inside a recent episode

Breaking Down the Handoff Wall: Connecting Design, Construction and Delivery

Published 1 Oct 2026 · Transcript excerpt

[…] From what I've seen, different projects I've worked on, customers that we've worked with, the strongest handovers are are the ones that are more continuous or progressive. They happen and they occur throughout execution. They're not just assembled at the end. That's the way it used to be done. Completion status, inspection records, changes, asset information, turnover documents, all of that evidence should start being developed as the asset's being built. When the information's disconnected, that's when the owner starts to receive a facility that it looks physically complete, it looks like everything's there, but there's still a lot of unanswered questions as to whether or not it's really ready to operate. […]

Read the full transcript with a Pod Engine plan.

See plans

Who has been a guest on ENR Critical Path Podcast

Names identified in recent episode analyses. Showing up to five guests.

  • Jay Schwartz
  • Paul Connell
  • Stephen Cavanaugh
  • Geoffrey Bender
  • Allie Kelly

Reach and audience

Public platform figures. Ratings count people who left a rating, not total listeners.

Apple Podcasts (US)
4.0 / 5
8 ratings
Spotify
5.0 / 5
1 ratings

Podcast Authority Score: 51 / 100

A composite of feed quality, social presence, YouTube performance and engagement. Read the methodology.

Quality
72
Social presence
0
YouTube
0
Engagement
75

Contact ENR Critical Path Podcast

Guest appearances
Books guests

Based on episode analysis; this does not confirm that the show is currently accepting guests.

Questions about ENR Critical Path Podcast

Who hosts ENR Critical Path Podcast?

Aileen Cho and Jeff Yoders and Bryan Gottlieb host the show. Published by www.enr.com.

How often do new episodes come out?

The show publishes daily, based on its RSS feed.

Does ENR Critical Path Podcast take guests?

Yes. Guests have been identified in episode analyses.

Where can I read transcripts?

29 of 146 episodes have a transcript on Pod Engine. Full transcripts are available with a Pod Engine plan.

Host of ENR Critical Path Podcast?

Claim your podcast to manage its listing and keep your show details accurate.

Claim this podcast

Pod Engine is an independent podcast discovery and analytics service and is not affiliated with or endorsed by this podcast. Artwork and show content belong to their owners. Full legal notice.

Explore this show
Podcast research with Pod Engine

See plans